SECR General Manager inspects Railway Hospital at Wagon Repair Shop colony

Source: The Hitavada      Date: 29 Dec 2017 10:42:43


 

Staff Reporter,

RAIPUR,

South East Central Railway (SECR) General Manager Sunil Singh Soin visited Railway Hospital located at Wagon Repair Shop colony during inspection. He interacted with the patients admitted at the hospital and took note of the situation.


SECR GM, Soin interacted with Chief Medical Superintendent of Railway Hospital and came to know about the present condition and facilities available with the hospital. GM expressed satisfaction over the performance and maintenance of the hospital. He expressed his desire to develop the hospital in to multi-specialty hospital with all modern facilities for the railway staff.


The modern hospital should depict beautiful image of Railway. He ordered the officials to change the old furniture from hospital and replace them with modern and new one.
Cleanliness should be maintained in the hospital he added. Divisional Railway Manager Kaushal Kishore, Secretary to General Manager Himanshu Jain, Chief Medical Superintendent B Chakravarty and other divisional officials
were present during the visit.


RUB to be facilitated near Nehru Nagar gate soon Soon the residents and people of Bhilai will have the facility of Railway Under Bridge (RUB) available at level crossing number 443 commonly known as Nehru Nagar gate between Bhilai-Durg. For the construction of subway twin box have been constructed which are six meter wide and 3.7 meters in size. Three segments of this size boxes will be used for the construction of the subway. The size of entire subway will be 13.05 meters in width and 36 meters in length.


Local residents demanded the subway at the earliest for which local committee staged dharna few days back. On December 20 SECR General Manager Sunil Singh Soin inspected the area and directed the railway officials to complete work on top priority.


As per schedule by the end of February 2018 the twin boxes will be placed under the tracks. Retaining wall construction will be done by railway and approach road will be constructed by state government, Public Works Department Bridge division.